CDC Inspection Report: Norwegian Jewel
Inspection Date: 2019-05-14 • Operator: Norwegian Cruise Line • Score: 98 / 100
Final Score 98 / 100
Evaluation Satisfactory
Deficiencies Cited 1
Points Deducted -2 pts
Inspection Findings Key Facts
- Inspection was conducted on 2019-05-14, Tuesday, May 14, 2019 for vessel Norwegian Jewel (IMO 9304045).
- Operator on inspection date was Norwegian Cruise Line.
- Inspection type was Periodic Routine.
- Final inspection score was 98 out of 100 points (Satisfactory).
- Passing threshold in force on inspection date was 86 points.
- Total of 1 deficiency items were cited resulting in 2 deducted points.
Inspection Overview
Ship Name at Inspection Norwegian Jewel
IMO Entity Key 9304045 (View Ship Dossier →)
Operating Cruise Line Norwegian Cruise Line
Inspection Type Periodic Routine
Advertisement Space (ad-after-table)
Cited Deficiency Items & Corrective Actions
VSP Operations Manual citations
VSP Inspector Citation:
Galley waste air curtain fan switch turned off during evening cleaning shift. (Observed during CDC inspection on Norwegian Jewel).
Cruise Line Corrective Action Statement:
"Air curtain powered on and interlock verified operational."